Gemeinde Root
Root
Connection Application to the Lower Rontal Water Supply
- 29 October 2025
- 100%
- Permanent position
- Root
Job summary
Apply for a water connection request in Root, Switzerland. A great chance to ensure your project has water access!
Tasks
- Submit a request for water supply connection per building.
- Provide details about expected water consumption and installations.
- Include required documentation and contact information.
Skills
- No specific qualifications required, just follow the guidelines.
- Basic understanding of water supply requirements.
- Ability to fill out forms accurately.
Is this helpful?
About the job
To be completed by the WS: Application No. / ReceiptConnection application to the Lower Rontal water supply
(Submit one application per building to the office)
The applicant(s) request connection to the Root water supply network for:
Object:
(Multi-family house, detached house, residential and commercial building, commercial building; new build, extension, conversion, etc.)
Parcel No.
Land register Root building insurance no.
(GVL)
Location, street, no., possibly building designation:
1. Involved persons / companies (name and first name or company, address)
Applicant/Builder:
Tel.
Architect:
Tel.
Sanitary planner:
Tel.
Sanitary contractor:
Tel.
(if known)
Correspondence address:
Builder
Architect
2. Information on the expected water consumption: (according to sanitary planner)
Installations in the building must be carried out according to the W3 guidelines (incl. E3 09/2020) of the SVGW
Request our pressure device!
(mario.portmann@gemeinde-root.ch, +41 79 550 00 86, Mario
Portmann BM)
Normal installations: (e.g. apartments, office, commercial)
Total load values
LU largest individual load value
LU
Number of apartments:
Number of commercial enterprises:
Additional systems:
Rainwater utilisation
Swimming pool
Pressure boosting system additional private water connection
Water treatment system
Special installations: (in addition to normal consumption e.g. continuous or peak consumption)
Max. required flow rate industry / commerce / sports facilities l/s
3
Max. required daily consumption commerce/industry (only if>10m³/day) m³/d
Firefighting equipment with water: (according to GVL requirements)
None
Small fire post (connection pipe max. DN 32)
Number
Internal hydrant (connection pipe min. DN 40)
Number
Sprinkler system: required flow rate l/s
3. Dates:
Expected start of construction:
Commissioning:
4. Remarks:
Lower Rontal Water Supply Platz 1a
T 041 455 56 91
6039 Root D4 mario.portmann@gemeinde-root.ch www.gemeinde-root.ch
5. Documents: (paper form or by e-mail in PDF format)
Connection application signed on all sides
Situation (land register plan)
1:500 500
Floor plans of all floors (with location of distribution battery)
1:100 or 1:50
Section plans
1:100 or 1:50 each
For firefighting equipment with water GVL provision
Place:
Date:
Applicant/Builder:
Landowner:
Architect/Plan author: