THE GENTLE PIPE REHABILITATION METHOD WITHOUT BREAKING WALLS TRADITIONAL REHABILITATION METHODS
Key information
- Publication date:18 January 2024
- Workload:100%
- Contract type:Unlimited employment
- Place of work:Cham
Job summary
Experience innovative pipe renovation with Swiss Kanalservice! Enjoy hassle-free solutions and a friendly work atmosphere.
Tasks
- Utilize RabbitResin coating for efficient pipe rehabilitation.
- Conduct thorough inspections and document renovation progress.
- Ensure minimal disruption to residents during the process.
Skills
- Technical knowledge in plumbing or relevant experience.
- Strong problem-solving and analytical skills.
- Excellent communication and customer service abilities.
Is this helpful?
BREAKING
THE GENTLE
PIPE REHABILITATION
TRADITIONAL
REHABILITATION METHODS
DISADVANTAGES WHEN REPLACING SEWAGE PIPES Use of WC & kitchen drains over construction periods of 1-2 weeks construction time not possible (possibly over costs for accommodation such as hotels for several days/weeks) rental losses
Restricted use of apartments Burdens on tenants due to various opening of walls and ceilings
Craftsmen (painters, tilers, etc.) Burden from dust and dirt over the construction period
THE INNOVATIVE
PIPE REHABILITATION
ADVANTAGES OF THE POLYPIPE COATING METHOD WITH RabbitResin - High cost-effectiveness
- The rehabilitation can largely be carried out over
- Cost savings of up to 50% existing openings or sanitary objects
- Short construction time
- Little to no dirt or dust
- Low burden on residents
- Everything from a single source
WITH SUCCESS GUARANTEE
ASSESSMENTS via TV inspection- CLEANING AND DRYING of the sewage lines. Here the condition is documented as preparation for the subsequent coating. E R T
E R
KEEP THE W
OF YOUR PROPERTY
.
APPLICATION OF THE 2-COMPONENT RE- DOCUMENTATION of the completed rehabilitations ACTION RESIN using spray or brush technology. 50 YEAR OLD
CAST PIPE
PROTECT YOUR BUILDING,
BEFORE IT'S TOO LATE!
Damage from corrosion or breakage of the pipes inevitably leads to moisture damage and associated mold growth. THIS IS HOW PIPE
REHABILITATION WORKS
APPLICATION AREAS
WASTEWATER PIPES
The main application area of the coating technology is in pipes (DN 40-200) within buildings. Rehabilitation and repair is thus possible for INTERNAL RAINWATER PIPES following piping systems:
BALCONY, ROOF, AND TERRACE DRAINS APPLICATION IN PRACTICE
TV INSPECTION
CLEANING
REHABILITATION
Cast pipe DN 70
Cast pipe DN 70
Cast pipe DN 70 in the current state after gentle cleaning after successful rehabilitation THE INNOVATIVE MATERIAL
RabbitResin
RabbitResin is a specially developed, solvent-free polyurethane resin that hardens within 3-5 minutes. This means it does not run off during the application and can be completed within a day. Thus, both the working time and the effort are significantly reduced. Since only 3-4 coating processes are necessary to create the pipe-in-pipe system, the pure hardening time between the processes is only about 12 minutes. Compared to other pipe rehabilitation techniques, you save costs, time, and effort with our coating system. The RabbitResin forms a durable, abrasion- and impact-resistant, smooth surface - it is corrosion-resistant and temperature-resistant up to 93°C. This prevents damage from thermal expansion and other mechanical stresses and avoids deposits and attachments. A layer of PU resin with the RabbitCoater RabbitResin contains no styrene or carcinogens THE USE OF THIS SYSTEM IS SUITABLE FOR PRACTICALLY ALL COMMON PIPE MATERIALS:
Plastics in the sanitary sector (PVC, PE, PP, GFK)
Concrete, fiber cement, stoneware Metals such as copper, stainless steel, and cast iron WHAT OUR
COATING TECHNOLOGY OFFERS
Rehabilitation of wastewater pipes without breaking - burden from dust and noise is eliminated Point damage repair possible Rehabilitation takes place over existing sanitary objects - no expensive and pollution-intensive excavation
No additional costs for e.g. drywallers, tilers, or masons
Material-independent rehabilitation - mostly plastic or cast iron Rehabilitation of very small pipes from DN 40 possible Permanently elastic, smooth surface improves flowability, the formation of deposits is made more difficult Very short drying time of 3-5 minutes Minimal restrictions for residents/affected
THE COMPLETE CHANNEL SERVICE
SWISS KANAL
We are happy to be at your service Emergency service 24 h / 365 days We are quick and reliable in action, do not hesitate to call us. SPACE FOR NOTES
Swiss Kanalservice GmbH
Eichweg 6
CH-8154 Oberglatt ZH
Swiss Kanalservice GmbH
Rütiweg 4
6330 Cham
Coating System
0800 020 020 info@swisskanalservice.ch licensed by Polypipe Vertriebs GmbH & Co. KG